Under EXW (Ex Works), the seller delivers when the goods are placed at the buyer’s disposal at the named place, commonly a factory or warehouse. The seller is not required to load the collecting vehicle or clear the goods for export. That makes the precise pickup point, loading plan and export arrangement more important than the three-letter term alone.

EXW can give an experienced importer control over origin logistics, but it can also expose a buyer to tasks that are difficult to perform remotely. Before accepting an EXW quote from China, compare it with FCA at the same location and price every activity between the factory floor and the international carrier.

What EXW actually allocates

ActivityDefault EXW positionWhat the buyer should confirm
Make goods availableSellerExact date, address, pickup hours and contact
Load the collecting vehicleBuyerWho supplies labor/equipment and bears loading damage
Export clearanceBuyerWhich eligible party will file and provide export evidence
Origin transportBuyerVehicle type, access limits, permits and terminal cutoff
Main carriage and insuranceBuyerCarrier, route, cover, documents and claims process
Import and final deliveryBuyerImporter, broker, duty/tax, delivery access and unloading

Incoterms describe delivery, risk and specified cost responsibilities under the sales contract. They do not decide product quality, payment security, ownership, regulatory compliance or dispute resolution. Those controls still belong in the purchase order and supporting agreements.

Name the pickup point precisely

“EXW China” is incomplete. The contract should state the full factory or warehouse address, the specific pickup point and “Incoterms 2020.” A large industrial site may have several gates or warehouses, and moving cargo from an upper floor to a loading bay may require labor or equipment that nobody included in the quote.

  • Confirm whether packed goods will be at ground level or require internal movement.
  • Record loading-bay restrictions, vehicle height limits and appointment requirements.
  • Agree who supplies a forklift, crane, pallet jack or loading labor.
  • Set the pickup window and the notice required if production is late.
  • Define the evidence of quantity and condition at handover.

Why loading is a frequent EXW dispute

A supplier may routinely load trucks as a commercial courtesy even though EXW does not require it. A courtesy is not a reliable risk allocation. If the supplier loads, put the service, price, responsibility and damage procedure in writing. If the buyer’s carrier loads, confirm that the driver and equipment can safely handle the cargo.

For machinery, stone, furniture, glass, long profiles or unusually heavy cartons, loading method affects both safety and cargo condition. Final packaging and pickup photos should be available before the vehicle departs, but photos do not replace a clear responsibility clause.

Plan export clearance before booking pickup

EXW places export formalities on the buyer. A foreign buyer may not be able to complete those formalities directly in the country of export. The practical arrangement may involve the seller, a trading company, an export agent or a forwarder. The buyer should know which legal entity appears on the commercial and export documents, who provides the required product information, and who retains proof of export.

Do not dispatch the truck until the export-document chain has been checked. A mismatch among seller identity, invoice, packing list, declaration data and transport documents can create delay or compliance questions later.

Compare EXW with FCA at the factory

FCA is often a cleaner alternative when the seller can load the buyer’s carrier and complete export clearance. Under an FCA factory arrangement, the named place can still be the seller’s premises, while the responsibilities better match a cross-border transaction.

DecisionEXW factoryFCA factory
Seller loads buyer’s vehicleNot requiredRequired when delivery is at seller’s premises
Seller clears exportNoYes
Buyer controls main freightYesYes
Best fitBuyer can manage pickup and export chainSeller can perform loading and export formalities

Compare the two terms with identical cargo data and the same pickup address. A higher FCA product price may still produce a lower-risk or lower-cost transaction once loading, export agency and origin coordination are included.

Build the complete EXW cost stack

An EXW landed-cost model should include the product, export packaging, factory loading if purchased separately, pickup, origin warehouse or consolidation, export agent, declaration, terminal handling, security or screening, main carriage, insurance, destination handling, customs brokerage, duty, tax, inspection, storage and final delivery.

Use the shipping cost from China model to compare complete offers. For ocean cargo, also decide whether FOB shipping from China or FCA gives the buyer enough freight control without the same factory-pickup burden.

Information to send the pickup provider

  • Full pickup address, contact, operating hours and readiness date
  • Carton or crate count, dimensions, gross weight and stackability
  • Commodity description, HS classification under review and cargo value
  • Battery, liquid, magnetic, chemical, wood-packaging or other handling characteristics
  • Required vehicle, loading equipment and appointment procedure
  • Export-document owner and terminal or carrier cutoff
  • Insurance instructions and exception contacts

Release checklist before the truck arrives

  1. Approve production and packaging through the agreed quality-control process.
  2. Reconcile final quantities, carton marks, dimensions and weights.
  3. Confirm the named pickup point and loading responsibility in writing.
  4. Verify the export-clearance party and document set.
  5. Check carrier booking, cutoff, route and insurance.
  6. Agree how shortages, visible damage or a failed pickup will be recorded.
  7. Collect signed handover evidence and transport documents.

When EXW is a poor fit

EXW is usually a poor fit when the buyer has no reliable China pickup network, cannot control export clearance, is combining several suppliers without a consolidation plan, or needs the seller to provide clean export evidence. It may also be unsuitable when specialized loading equipment is needed and the factory is the only party able to operate it safely.

A forwarder or sourcing partner can coordinate the chain, but the buyer should still ask who is performing each legal and physical task. Review the broader Incoterms decision guide before selecting a replacement term.

Frequently asked questions

Does the EXW seller have to load the truck?

No. Under the default EXW allocation, the seller is not required to load the collecting vehicle. If the seller will load, record the service and risk arrangement in the contract.

Does EXW include export customs clearance?

No. The buyer is responsible for export clearance under EXW. Buyers should confirm that the planned party can legally and operationally complete the export process.

Is EXW always the cheapest Incoterm?

No. The factory quote can look lower because more origin tasks sit outside it. Compare EXW and FCA using the same cargo, route and delivered-cost boundary.

Can EXW be used for air and sea freight?

Yes. EXW is available for any mode of transport. Suitability depends on the buyer’s ability to manage the origin responsibilities, not on the transport mode alone.

Authoritative references

Sources reviewed September 30, 2026. Confirm the current contract, export, customs and insurance requirements with qualified parties for the shipment.