China Sourcing Checklist: Eight Evidence Gates Before Shipment

A China sourcing checklist should function as a sequence of release gates. Each gate requires evidence before the buyer commits more money or loses leverage. The checklist below covers product definition, supplier identity, quotation, samples, contract, production, inspection, and shipment.
Gate 1: product and market readiness
- Destination countries and sales channels are confirmed.
- Applicable product rules, tests, labels, claims, and importer duties are mapped.
- Specification includes dimensions, materials, tolerances, performance, finish, accessories, packaging, and approved substitutions.
- Forecast, target landed cost, MOQ limit, and launch date are realistic.
Gate 2: supplier identity and capability
| Check | Evidence | Pass condition |
|---|---|---|
| Legal identity | Chinese name, registration, license, addresses | Contracting entity exists and matches the records |
| Payment | Bank beneficiary and explanation of related parties | Payment route aligns with the contract |
| Factory | Production address, process, equipment, subcontractors | Capability matches the required construction |
| Quality | Incoming, in-process, final and corrective-action records | Controls cover critical characteristics |
| Capacity | Current load, shifts, bottlenecks and lead-time basis | Schedule is supported, not promised vaguely |
Apply the full supplier verification process before paying an unfamiliar entity.
Gate 3: comparable quotation
Confirm specification revision, quantity, unit price, tooling, setup, sample cost, testing, packaging, MOQ, lead time, payment, Incoterm and named place, validity, warranty, and exclusions. Normalize every supplier quote to the same basis.
Gate 4: sample and compliance approval
Give each sample a revision and test status. Confirm materials and components, function, dimensions, finish, labels, packaging, and compliance evidence. Reports must match the ordered model and responsible manufacturer. Record deviations and close them before approving production.
Gate 5: purchase contract
| Contract control | Required detail |
|---|---|
| Product | Attached specification, BOM, drawing and approved sample |
| Changes | Written approval before material, process, factory or packaging changes |
| Quality | Defect limits, tests, inspection rights, rework and remedies |
| IP and tooling | Ownership, storage, maintenance, confidentiality and return |
| Delivery | Milestones, Incoterm, documents, delay process and release criteria |
| Payment | Amount, beneficiary, evidence gates and balance conditions |
Gate 6: production control
- Critical materials and first production output are approved.
- Milestones and bottlenecks are reported against actual evidence.
- Changes and deviations are logged before use.
- During-production inspection is scheduled when late correction would be costly.
Gate 7: inspection and corrective action
Inspect quantity, identity, workmanship, dimensions, function, labels, packaging, and carton data against the approved revision. Separate critical, major, and minor defects. Contain failures, document root cause, verify corrections, and reinspect where necessary. Use the China product inspection checklist for a shipment-level plan.
Gate 8: shipment and document release
- Commercial invoice, packing list, transport data, and origin information agree.
- Actual carton dimensions, weight, package count, and marks are confirmed.
- Required test reports, certificates, permits, and labels are complete.
- Booking, insurance, customs data, destination delivery, and document owner are clear.
- Balance payment follows the agreed evidence, not only a completion message.
Keep the completed checklist with the sourcing file. A blank template has little value; the audit trail comes from names, dates, document links, decisions, and approved exceptions.
How to use the checklist with payment milestones
Connect deposits, tooling payments, production balance and shipment release to evidence appropriate to the project. A deposit may follow legal and capability approval; tooling payment may follow tool design or sample milestones; the production balance may follow inspection and document review. Do not use the same payment pattern for every supplier without considering leverage and risk.
Approved exceptions should name the unmet requirement, reason, affected quantity, temporary control, decision owner and expiry. An exception without an expiry can silently become the new standard.
Checklist ownership
Assign one owner to every gate and one person with authority to stop the order. Specialists may approve compliance, engineering, quality, customs or payment evidence, but the project record should show the final release decision. Version the checklist so changes to requirements are visible between orders.
For repeat orders, do not restart from a blank checklist. Copy the prior approved record, confirm what changed, revalidate expired evidence and review previous defects. This preserves learning while preventing an old approval from being treated as permanent.